Projects
Wohler Bridge Replacement
The replacement of the Wohler Bridge includes construction of a new two lane road bridge over Mark West Creek, on Wohler Road. The new bridge will be constructed on a new alignment and the current bridge demolished only after construction of the new bridge is complete.
Chalk Hill Bridge Replacement
Public Infrastructure has completed the technical field investigations and has held three community outreach meetings. Based on the feedback from the community outreach meetings, Public Infrastructure has determined that the existing bridge will be removed and has selected the bridge alignment and roadway width.
Monte Rio Bridge Retrofit
While originally planned as a total bridge replacement, Public Infrastructure has determined that a retrofit is the more effective option. Preliminary investigation of the project approach/methodology is underway.
Hauser Bridge Replacement
Replacement of the one-lane bridge over the South Fork of the Gualala River was completed in 2018 with a two lane, 29 foot wide and 165 foot long steel bridge.
Other Recent Replacements, Retrofits, and Maintenance
Summerhome Park Road (2015), Neely Road (2015), Austin Creek Road (2014), Annopolis Road Bridge (2014 and 2011), Scouts Camp Road (2014), Starrett Hill Drive (2014), Pacific Avenue (2014), Porter Creek Bridge (2013), Roadway and Bridge Preservation Program (2010), Crocker Road Bridge (2006), River Road Viaduct (2006), Korbel Crossing (2006), Riverside Drive Bridge (2005).